Used 3 BPD Pilot Gas-to-Liquids (GTL) plant for sale immediately available. The plant was built in 2013 and had the first liquid production in 2014. It includes one (1) syngas reactor and four (4) Fischer Tropsch (FT) reactors. The syngas reactor has design pressure up to 38 bar and design temperature up to 1400 degree C methane flow rate up to 800 L/minute. Rhodium catalyst in Syngas reactor. Conversion of methane to Syngas 65% (commercial goal 80% with 80% selectivity to Hydrogen at a H2:CO ratio of 2:1). Cobalt catalyst in FT reactor. The equipment is skid-mounted for easy relocation and set-up.