Unused 85 TPD (5 MMSCFD) LNG plant built in 2014. Plant equipment manufactured in 2014 but never installed or used due to project cancellation. Designed feed gas composition: methane 98.2%, ethane 0.6%, propane 0.3%, carbon dioxide 0.3%, nitrogen 0.4%; temperature 30 degree C, pressure 25 - 30 bar. LNG product composition: methane 98.7%, ethane 0.6%, propane 0.3%, carbon dioxide 30 ppm max, nitrogen 5 ppm max; temperature -145 degree C, pressure 2.5 bar. Total plant power requirement 2817 KW. Electrical 380 V, 50 Hz, 3 phases. Full technical services such as re-engineering, supervision of installation and commissioning, training, process warrantee are available.