Phoenix Equipment recently purchased a complete 56 MW (13.8 KV, 60 HZ) Combined Cycle Cogeneration power plant for liquidation. The plant was built in 1989-90. Major components are available as whole or parts, and include: General Electric GE Frame 6B Natural Gas-Fired Turbine Generator, ABB Alstom Condensing Steam Turbine Generator, Joy Ecolaire Horizontal Admiralty Brass Shell & Tube Steam Turbine Condenser, Heat Recovery Steam Generator, Atlas Copco Air Compressors and Sulzer Boiler Feed Water Pumps.