Used 45,000 TPY Ethylene Oxide (EO) Plant built in 1988. The EO Production Plant primarily consists of tubular reactors loaded with a silver-containing catalyst and fractionation equipment for the removal of carbon dioxide and the purification of ethylene oxide.