Used 320 MTPD carbon dioxide liquefaction plant for sale. The plant includes two (2) skid-mounted trains, each 160 MTPD, to operate through temperatures ranging from -40 to +95 degrees Fahrenheit. Unit 1 was commissioned in 2004, Unit 2 commissioned in 2007. The plant is designed to recover CO2 from natural gas and to inject the recovered CO2 to gas well. Fully automated 2-rack loading system; 1,440 tons of on-site storage capacity (4 vessels). The plant was purged with dry CO2 and remains under a positive pressure of dry CO2 after it shut down.