Used 140,000 TPY HDPE Plant built in 1977. The plant has two identical production lines. Each line can produce 70,000 TPY. Each line has two polymerization reactors. Two of the four reactors were built and installed in 2006. In 2004 and 2006, the plant installed new centrifuges (8 ton/hour) and fluidized bed dryers (2 stages). The plant is equipped with two full lines of extrusion and packing. Different grades of products can be produced with easy setting adjustment. Complete documents are available as well as possible technical assistance of installation and start-up.