Simple-Cycle, Gas Turbine Power Generating Station, dual fuel (natural gas or kerosene), with a twin-pack configuration. (8) FT4 A9 Pratt & Whitney Gas Turbines, (4) 46,500 KVA Electric Machinery Generators, (1) Transformer Available. Each Twin-Pack consists of (1) Generator and (2) FT4 A9 gas turbine engines (A or Counter & B or Counter Clock side), which together produce 42 MW. It is possible to operate only 1 side or ½ of the Twin-Pack to produce only 21 MW. All (4) Twin-Packs are available and can produce 168 MW; individual Twin-Packs also available; quoted as individual.