Amine Treating Plant - 150 MMSCFD / 700 GPM
Other Views - click image for larger view
Amine Treating Plant - 150 MMSCFD / 700 GPM Amine Treating Plant - 150 MMSCFD / 700 GPM Amine Treating Plant - 150 MMSCFD / 700 GPM Amine Treating Plant - 150 MMSCFD / 700 GPM Amine Treating Plant - 150 MMSCFD / 700 GPM Amine Treating Plant - 150 MMSCFD / 700 GPM

Amine Treating Plant - 150 MMSCFD / 700 GPM

Stock # 462
Capacity 150 MMSCFD
Products Natural Gas (<3% CO2 and <4 ppm H2S)

Overview

Unused 150 MMSCFD / 700 GPM Audubon Engineering Amine plant built in 2014. Gas flow rate 150 MMSCFD, circulation 700 GPM, inlet gas pressure 1100 PSI (maximum working pressure 1350 PSI), designed to remove 7% CO2, 50 ppm H2S. Contactor Size: 90" ID x 60' Stainless Steel, Vertical, 1350 MAWP. MCC Building and PLC Controls. Mfg. 2014.

Major Equipment

Amine Gas Filtration Skid
Amine Towers Skid
Amine Polishing Skid
Amine Unit Gas Coolers
Amine Flash Separator Skid
Heat Media Heater
Burner Management Skid
Heat Media Pump Skid
Amine Circulation Pumps Skid
Amine Liquid Removal Skid
Share
SPECIFICATIONS RESOURCES
Year Built
2014
Year Shut
Capacity
150 MMSCFD

For additional information, visit the Resource Center

Similar Plants