Four (4) Used 25,000 TPY, 25,000 TPY, 32,000 TPY and 35,000 TPY Formaldehyde Plants built in 2012. Produce 37% – 48% formaldehyde and urea-formaldehyde precondensate (UFC). Plants shut down in 2012. All plants use tube reactors filled with pellets of iron-molybdenum oxide catalyst. These plants can be operated independently, or combined together for production at a larger capacity. Available Technical Services: engineering re-design, process upgrade, process Integration, installation guidance, training, commissioning supervision. Performance Guarantee may be offered.